The Rulebook, in the Open

The Rulebook, in the Open

The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.

The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.

What the Standard Requires

What the Standard Requires

Every credit must be real, additional, permanent, independently verified and unique. Additionality is tested strictly and cumulatively, baselines are conservative, quantification follows IPCC AR6 values, and removal projects hold a 5% buffer against reversal.

Where the Documents Live

Where the Documents Live

The Standard and the methodologies sit on standards.renewcred.com, with version history and no registration walls.

Who Governs It

Who Governs It

Rulemaking sits with the Science Governing Council, a seven member body with an independent majority. The Governance Document explains how the lock works.

Have Your Say

Have Your Say

Every instrument passes through public consultation before it takes effect. Every comment receives a response.

The standard

The standard

The RenewCred Standard

The RenewCred Standard

The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.

The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.

Scope and Structure

Scope and Structure

The Standard is supported by a modular framework and annexes covering the conflicts register, the evidence checklist, registry procedures and the validation and verification framework, together with the Ratified Parameter Register: the single controlled list of scientific values that drive credit quantities.

Core Requirements

Core Requirements

Real, additional, permanent, independently verified and unique, applied as strict requirements. Quantification is typed by pathway: reduction, avoidance, removal, or hybrid, where a hybrid project issues one credit carrying immutable avoidance and reduction components. Monitoring is annual with at least one verification a year by default, and no credit is issued under a qualified verification opinion.

Versioning

Versioning

Versions are dated and permanent. A project validated under a given version can point to that exact document years later, because superseded versions remain accessible in the archive.

Status

Status

Version 1.0 is active. The consultation bundle, including the Register and the Code as Source package, is downloadable from this site.

Read Full Standard

Read Full Standard

 METHODOLOGIES

 METHODOLOGIES

Methodologies

Methodologies

A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.

A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.

How to Read a Methodology Page

How to Read a Methodology Page

RC-BIO-ART

Version 1.0 

Active

Active

Each page states the code, the version, the status, what the methodology covers, how it quantifies outcomes and which parameters it draws from the Ratified Parameter Register, with the full document attached.

Status Labels

Status Labels

Active

Active means credits can be issued under it today.

Inactive

Inactive means no new credits can be issued under it. Credits already issued stay valid.

In Public Consultation

In consultation means the draft is open for public comment.

Public Consultation Closed

Public Consultation Closed means the comment period has ended and feedback is being reviewed.

Public Consultation Closed means the comment period has ended and feedback is being reviewed.

Propose a Methodology

Propose a Methodology

If your project type is measurable but not yet covered, the methodology development route develops a new methodology with our science community and takes it through public consultation before approval.

Open Methodologies

Open Methodologies

PUBLIC CONSULTATIONS

Public Consultations

Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.

Open Now

The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.

Read the Open Drafts

How It Works

Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.

Last Closed Consultation

Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.

Call for Consultation

View

Feedback Received

View

RenewCred’s Response

View

PUBLIC CONSULTATIONS

Public Consultations

Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.

Open Now

The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.

Read the Open Drafts

How It Works

Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.

Last Closed Consultation

Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.

Call for Consultation

View

Feedback Received

View

RenewCred’s Response

View

DOCUMENT LIBRARY

DOCUMENT LIBRARY

Document Library

Document Library

Every public RenewCred instrument, versioned, dated and free to download.

If it governs a credit, it is here.

Every public RenewCred instrument, versioned, dated and free to download. If it governs a credit, it is here.

What You Will Find

What You Will Find

The Standard and its modular framework. The annexes, including the conflicts register, the evidence checklist, registry procedures and the validation and verification framework. The Ratified Parameter Register. All methodologies. The project design and monitoring templates. The Project Proponent Agreement, published in full.

Versioning and the Archive

Versioning and the Archive

Documents carry version numbers, statuses and effective dates. Superseded versions remain accessible, because a project validated under version 1.0 of a methodology must be able to point to that exact document years later.

No Walls

No Walls

No registration, no request forms, no NDA. Download and scrutinise.

VALIDATION & VERIFICATION

VALIDATION & VERIFICATION

Independent by Construction

Independent by Construction

Validation and verification are performed by independent accredited bodies, never by RenewCred.

Assignment runs through a blind pool, so neither the developer nor RenewCred chooses the checker. Independence is not a promise here. It is the mechanism.

The Blind Pool

The Blind Pool

Accredited bodies are assigned to projects at arm's length from everyone with a stake in the outcome, under a documented oversight framework.

What They Check

What They Check

Projects are validated against the Standard before crediting begins, and verified against the evidence checklist and the live monitoring record, with at least one verification a year. No credit is issued under a qualified opinion.

Better Evidence, Stronger Verification

Better Evidence, Stronger Verification

Continuous data does not replace the verifier. It arms them: richer datasets, earlier anomaly detection, and conclusions drawn from the record rather than the visit.

Become an Accredited VVB

Become an Accredited VVB

RenewCred accredits external validation and verification bodies under a published framework. If your organisation holds relevant accreditation and wants to work under the Standard, the route to apply starts here.

Apply for VVB Accreditation

Apply for VVB Accreditation

GOVERNANCE

GOVERNANCE

Who Guards the Standard?

Who Guards the Standard?

A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.

A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.

01

01

The Science Governing Council

The Science Governing Council

The Council approves methodologies, ratifies the scientific parameters that drive credit quantities, and controls changes to both. Its decisions are recorded, and the values it ratifies are published in the Ratified Parameter Register with change control that sits with the Council alone.

02

02

The Independence

Lock

The Independence

Lock

The independent majority is structural: commercial interest cannot outvote it, and conflicts are recorded in a published conflicts register. The rulebook cannot be captured by the people it regulates, including us.

03

03

Grievances, Complaints and Appeals

Grievances, Complaints and Appeals

Any stakeholder may raise a grievance, complaint or appeal, against a decision, a project or the programme itself. Each is acknowledged, handled under the published procedure and answered formally. The channel is on this page and in the footer of every page.

04

04

The

Documents

The

Documents

The Governance Charter, the conflicts register and the grievance procedure are in the Document Library, in full.

SCIENCE

SCIENCE

Where the Science Lives

Where the Science Lives

RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.

RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.

The Approach

The Approach

Measurement over estimation, wherever measurement exists. Methodologies are drafted by working scientists, reviewed by an independent community of over 100 climate scientists, and ratified by the Science Governing Council before anything is credited under them.

Settled Positions

Settled Positions

IPCC AR6 values on a 100 year horizon. Strict cumulative additionality. Conservative baselines. Per activity buffers for removals. Every quantitative value that drives a credit is fixed in the Ratified Parameter Register, with its source and status stated, so nothing numerical hides inside prose.

White Papers and Research

White Papers and Research

Research and white papers from the team and the community are published here as they are released, free to read and cite.

Work with Us

Work with Us

The RenewCred Science Community reviews methodologies, challenges assumptions and shapes the Standard. If that is your kind of work, join it.

Join the Science Community

Join the Science Community

Bengaluru, Karnataka, India

info@renewcred.com

+91-814-727-7878

Always available to save the planet

Follow Us

Subscribe to Our Newsletter

No spam. Just pure climate intelligence.

Join Our WhatsApp Community

Connect with fellow climate optimists.

Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.

|

CIN No.: U74909KA2024PTC188240

Bengaluru, Karnataka, India

info@renewcred.com

+91-814-727-7878

Always available to save the planet

Follow Us

Subscribe to Our Newsletter

No spam. Just pure climate intelligence.

Join Our WhatsApp Community

Connect with fellow climate optimists.

Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.

|

CIN No.: U74909KA2024PTC188240

The Rulebook, in the Open

The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.

What the Standard Requires

Every credit must be real, additional, permanent, independently verified and unique. Additionality is tested strictly and cumulatively, baselines are conservative, quantification follows IPCC AR6 values, and removal projects hold a 5% buffer against reversal.

Where the Documents Live

The Standard and the methodologies sit on standards.renewcred.com, with version history and no registration walls.

Who Governs It

Rulemaking sits with the Science Governing Council, a seven member body with an independent majority. The Governance Document explains how the lock works.

Have Your Say

Every instrument passes through public consultation before it takes effect. Every comment receives a response.

Read the Standard

Read the Standard

The Standard

The RenewCred Standard

The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.

Scope and Structure

The Standard is supported by a modular framework and annexes covering the conflicts register, the evidence checklist, registry procedures and the validation and verification framework, together with the Ratified Parameter Register: the single controlled list of scientific values that drive credit quantities.

Core Requirements

Real, additional, permanent, independently verified and unique, applied as strict requirements. Quantification is typed by pathway: reduction, avoidance, removal, or hybrid, where a hybrid project issues one credit carrying immutable avoidance and reduction components. Monitoring is annual with at least one verification a year by default, and no credit is issued under a qualified verification opinion.

Versioning

Versions are dated and permanent. A project validated under a given version can point to that exact document years later, because superseded versions remain accessible in the archive.

Status

Version 1.0 is active. The consultation bundle, including the Register and the Code as Source package, is downloadable from this site.

Read Full Standard

Methodologies

Methodologies

A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.

How to Read a Methodology Page

RC-BIO-ART

Version 1.0 

Active

Each page states the code, the version, the status, what the methodology covers, how it quantifies outcomes and which parameters it draws from the Ratified Parameter Register, with the full document attached.

Status Labels

Active

Active means credits can be issued under it today.

Inactive

Inactive means no new credits can be issued under it. Credits already issued stay valid.

In Public Consultation

In consultation means the draft is open for public comment.

Public Consultation Closed

Public Consultation Closed means the comment period has ended and feedback is being reviewed.

Propose a Methodology

If your project type is measurable but not yet covered, the methodology development route develops a new methodology with our science community and takes it through public consultation before approval.

Open Methodologies

Open Methodologies

PUBLIC CONSULTATIONS

Public Consultations

Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.

Open Now

The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.

Read the Open Drafts

How It Works

Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.

Last Closed Consultation

Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.

Call for Consultation

View

Feedback Received

View

RenewCred’s Response

View

Document library

Document Library

Every public RenewCred instrument, versioned, dated and free to download. If it governs a credit, it is here.

What You Will Find

The Standard and its modular framework. The annexes, including the conflicts register, the evidence checklist, registry procedures and the validation and verification framework. The Ratified Parameter Register. All methodologies. The project design and monitoring templates. The Project Proponent Agreement, published in full.

Versioning and the Archive

Documents carry version numbers, statuses and effective dates. Superseded versions remain accessible, because a project validated under version 1.0 of a methodology must be able to point to that exact document years later.

No Walls

No registration, no request forms, no NDA. Download and scrutinise.

Validation & verification

Independent by Construction

Validation and verification are performed by independent accredited bodies, never by RenewCred. Assignment runs through a blind pool, so neither the developer nor RenewCred chooses the checker. Independence is not a promise here. It is the mechanism.

The Blind Pool

Accredited bodies are assigned to projects at arm's length from everyone with a stake in the outcome, under a documented oversight framework.

What They Check

Projects are validated against the Standard before crediting begins, and verified against the evidence checklist and the live monitoring record, with at least one verification a year. No credit is issued under a qualified opinion.

Better Evidence, Stronger Verification

Continuous data does not replace the verifier. It arms them: richer datasets, earlier anomaly detection, and conclusions drawn from the record rather than the visit.

Become an Accredited VVB

RenewCred accredits external validation and verification bodies under a published framework. If your organisation holds relevant accreditation and wants to work under the Standard, the route to apply starts here.

Apply for VVB Accreditation

Apply for VVB Accreditation

Governance

Who Guards the Standard?

A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.

01

The Science Governing Council

The Council approves methodologies, ratifies the scientific parameters that drive credit quantities, and controls changes to both. Its decisions are recorded, and the values it ratifies are published in the Ratified Parameter Register with change control that sits with the Council alone.

02

The Independence Lock

The independent majority is structural: commercial interest cannot outvote it, and conflicts are recorded in a published conflicts register. The rulebook cannot be captured by the people it regulates, including us.

03

Grievances, Complaints and Appeals

Any stakeholder may raise a grievance, complaint or appeal, against a decision, a project or the programme itself. Each is acknowledged, handled under the published procedure and answered formally. The channel is on this page and in the footer of every page.

04

The

Documents


The Governance Charter, the conflicts register and the grievance procedure are in the Document Library, in full.

Science

Where the Science Lives

RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.

The Approach

Measurement over estimation, wherever measurement exists. Methodologies are drafted by working scientists, reviewed by an independent community of over 100 climate scientists, and ratified by the Science Governing Council before anything is credited under them.

Settled Positions

IPCC AR6 values on a 100 year horizon. Strict cumulative additionality. Conservative baselines. Per activity buffers for removals. Every quantitative value that drives a credit is fixed in the Ratified Parameter Register, with its source and status stated, so nothing numerical hides inside prose.

White Papers and Research

Research and white papers from the team and the community are published here as they are released, free to read and cite.

Work with Us

The RenewCred Science Community reviews methodologies, challenges assumptions and shapes the Standard. If that is your kind of work, join it.

Join the Science Community

Join the Science Community

Subscribe to our newsletter

No spam. Just pure climate intelligence.

Join Our WhatsApp Community

Connect with fellow climate optimists.

Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.

|

CIN No.: U74909KA2024PTC188240

Subscribe to our newsletter

No spam. Just pure climate intelligence.

Join Our WhatsApp Community

Connect with fellow climate optimists.

Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.

|

CIN No.: U74909KA2024PTC188240

The Rulebook, in the Open

The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.

What the Standard Requires

Every credit must be real, additional, permanent, independently verified and unique. Additionality is tested strictly and cumulatively, baselines are conservative, quantification follows IPCC AR6 values, and removal projects hold a 5% buffer against reversal.

Where the Documents Live

The Standard and the methodologies sit on standards.renewcred.com, with version history and no registration walls.

Who Governs It

Rulemaking sits with the Science Governing Council, a seven member body with an independent majority. The Governance Document explains how the lock works.

Have Your Say

Every instrument passes through public consultation before it takes effect. Every comment receives a response.

Read the Standard

THE STANDARD

The RenewCred Standard

The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.

Scope and Structure

The Standard is supported by a modular framework and annexes covering the conflicts register, the evidence checklist, registry procedures and the validation and verification framework, together with the Ratified Parameter Register: the single controlled list of scientific values that drive credit quantities.

Core Requirements

Real, additional, permanent, independently verified and unique, applied as strict requirements. Quantification is typed by pathway: reduction, avoidance, removal, or hybrid, where a hybrid project issues one credit carrying immutable avoidance and reduction components. Monitoring is annual with at least one verification a year by default, and no credit is issued under a qualified verification opinion.

Versioning

Versions are dated and permanent. A project validated under a given version can point to that exact document years later, because superseded versions remain accessible in the archive.

Status

Version 1.0 is active. The consultation bundle, including the Register and the Code as Source package, is downloadable from this site.

Read Full Standard

METHODOLOGIES

Methodologies

A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.

How to Read a Methodology Page

RC-BIO-ART

Version 1.0

Active

Each page states the code, the version, the status, what the methodology covers, how it quantifies outcomes and which parameters it draws from the Ratified Parameter Register, with the full document attached.

Status Labels

Active

Active means credits can be issued under it today.

Inactive

Inactive means no new credits can be issued under it. Credits already issued stay valid.

In consultation means the draft is open for public comment.

In Public Consultation

Public Consultation Closed

Public Consultation Closed means the comment period has ended and feedback is being reviewed.

Propose a Methodology

If your project type is measurable but not yet covered, the methodology development route develops a new methodology with our science community and takes it through public consultation before approval.

Open Methodologies

PUBLIC CONSULTATIONS

Public Consultations

Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.

Open Now

The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.

Read the Open Drafts

How It Works

Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.

Last Closed Consultation

Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.

Call for Consultation

View

Feedback Received

View

RenewCred’s Response

View

DOCUMENT LIBRARY

Document Library

Every public RenewCred instrument, versioned, dated and free to download. If it governs a credit, it is here.

What You Will Find

The Standard and its modular framework. The annexes, including the conflicts register, the evidence checklist, registry procedures and the validation and verification framework. The Ratified Parameter Register. All methodologies. The project design and monitoring templates. The Project Proponent Agreement, published in full.

Versioning and the Archive

Documents carry version numbers, statuses and effective dates. Superseded versions remain accessible, because a project validated under version 1.0 of a methodology must be able to point to that exact document years later.

No Walls

No registration, no request forms, no NDA. Download and scrutinise.

VALIDATION & VERIFICATION

Independent by Construction

Validation and verification are performed by independent accredited bodies, never by RenewCred.

Assignment runs through a blind pool, so neither the developer nor RenewCred chooses the checker. Independence is not a promise here. It is the mechanism.

The Blind Pool

Accredited bodies are assigned to projects at arm's length from everyone with a stake in the outcome, under a documented oversight framework.

What They Check

Projects are validated against the Standard before crediting begins, and verified against the evidence checklist and the live monitoring record, with at least one verification a year. No credit is issued under a qualified opinion.

Better Evidence, Stronger Verification

Continuous data does not replace the verifier. It arms them: richer datasets, earlier anomaly detection, and conclusions drawn from the record rather than the visit.

Become an Accredited VVB

RenewCred accredits external validation and verification bodies under a published framework. If your organisation holds relevant accreditation and wants to work under the Standard, the route to apply starts here.

Apply for VVB Accreditation

Apply for VVB Accreditation

GOVERNANCE

Who Guards the Standard?

A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.

01

The Science Governing Council

The Council approves methodologies, ratifies the scientific parameters that drive credit quantities, and controls changes to both. Its decisions are recorded, and the values it ratifies are published in the Ratified Parameter Register with change control that sits with the Council alone.

02

The Independence Lock

The independent majority is structural: commercial interest cannot outvote it, and conflicts are recorded in a published conflicts register. The rulebook cannot be captured by the people it regulates, including us.

03

Grievances, Complaints and Appeals

Any stakeholder may raise a grievance, complaint or appeal, against a decision, a project or the programme itself. Each is acknowledged, handled under the published procedure and answered formally. The channel is on this page and in the footer of every page.

04

The Documents

The Governance Charter, the conflicts register and the grievance procedure are in the Document Library, in full.

SCIENCE

Where the Science Lives

RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.

The Approach

Measurement over estimation, wherever measurement exists. Methodologies are drafted by working scientists, reviewed by an independent community of over 100 climate scientists, and ratified by the Science Governing Council before anything is credited under them.

Settled Positions

IPCC AR6 values on a 100 year horizon. Strict cumulative additionality. Conservative baselines. Per activity buffers for removals. Every quantitative value that drives a credit is fixed in the Ratified Parameter Register, with its source and status stated, so nothing numerical hides inside prose.

White Papers and Research

Research and white papers from the team and the community are published here as they are released, free to read and cite.

Work with Us

The RenewCred Science Community reviews methodologies, challenges assumptions and shapes the Standard. If that is your kind of work, join it.

Join the Science Community

Join the Science Community

Bengaluru, Karnataka, India

info@renewcred.com

+91-814-727-7878

Always available to save the planet

FOLLOW US

Sign up for our newsletter

No spam. Just pure climate intelligence.

Copyright © 2026 Net Zero Initiative Pvt Ltd.

All rights reserved.

CIN No.: U74909KA2024PTC188240

Join Our WhatsApp Community

Connect with fellow climate optimists.

Bengaluru, Karnataka, India

info@renewcred.com

+91-814-727-7878

Always available to save the planet

FOLLOW US

Sign up for our newsletter

No spam. Just pure climate intelligence.

Copyright © 2026 Net Zero Initiative Pvt Ltd.

All rights reserved.

CIN No.: U74909KA2024PTC188240

Join Our WhatsApp Community

Connect with fellow climate optimists.