The Rulebook, in the Open
The Rulebook, in the Open
The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.
The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.
What the Standard Requires
What the Standard Requires
Every credit must be real, additional, permanent, independently verified and unique. Additionality is tested strictly and cumulatively, baselines are conservative, quantification follows IPCC AR6 values, and removal projects hold a 5% buffer against reversal.
Where the Documents Live
Where the Documents Live
The Standard and the methodologies sit on standards.renewcred.com, with version history and no registration walls.
Who Governs It
Who Governs It
Rulemaking sits with the Science Governing Council, a seven member body with an independent majority. The Governance Document explains how the lock works.
Have Your Say
Have Your Say
Every instrument passes through public consultation before it takes effect. Every comment receives a response.
The standard
The standard
The RenewCred Standard
The RenewCred Standard
The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.
The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.
Scope and Structure
Scope and Structure
The Standard is supported by a modular framework and annexes covering the conflicts register, the evidence checklist, registry procedures and the validation and verification framework, together with the Ratified Parameter Register: the single controlled list of scientific values that drive credit quantities.
Core Requirements
Core Requirements
Real, additional, permanent, independently verified and unique, applied as strict requirements. Quantification is typed by pathway: reduction, avoidance, removal, or hybrid, where a hybrid project issues one credit carrying immutable avoidance and reduction components. Monitoring is annual with at least one verification a year by default, and no credit is issued under a qualified verification opinion.
Versioning
Versioning
Versions are dated and permanent. A project validated under a given version can point to that exact document years later, because superseded versions remain accessible in the archive.
Status
Status
Version 1.0 is active. The consultation bundle, including the Register and the Code as Source package, is downloadable from this site.
Read Full Standard
Read Full Standard
METHODOLOGIES
METHODOLOGIES
Methodologies
Methodologies
A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.
A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.
How to Read a Methodology Page
How to Read a Methodology Page
RC-BIO-ART
Version 1.0
Active
Active
Each page states the code, the version, the status, what the methodology covers, how it quantifies outcomes and which parameters it draws from the Ratified Parameter Register, with the full document attached.
Status Labels
Status Labels
Active
Active means credits can be issued under it today.
Inactive
Inactive means no new credits can be issued under it. Credits already issued stay valid.
In Public Consultation
In consultation means the draft is open for public comment.
Public Consultation Closed
Public Consultation Closed means the comment period has ended and feedback is being reviewed.
Public Consultation Closed means the comment period has ended and feedback is being reviewed.
Propose a Methodology
Propose a Methodology
If your project type is measurable but not yet covered, the methodology development route develops a new methodology with our science community and takes it through public consultation before approval.
Open Methodologies
Open Methodologies
PUBLIC CONSULTATIONS
Public Consultations
Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.
Open Now
The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.
Read the Open Drafts
How It Works
Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.
Last Closed Consultation
Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.
Call for Consultation
View
Feedback Received
View
RenewCred’s Response
View
PUBLIC CONSULTATIONS
Public Consultations
Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.
Open Now
The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.
Read the Open Drafts
How It Works
Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.
Last Closed Consultation
Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.
Call for Consultation
View
Feedback Received
View
RenewCred’s Response
View
DOCUMENT LIBRARY
DOCUMENT LIBRARY
Document Library
Document Library
Every public RenewCred instrument, versioned, dated and free to download.
If it governs a credit, it is here.
Every public RenewCred instrument, versioned, dated and free to download. If it governs a credit, it is here.
What You Will Find
What You Will Find
The Standard and its modular framework. The annexes, including the conflicts register, the evidence checklist, registry procedures and the validation and verification framework. The Ratified Parameter Register. All methodologies. The project design and monitoring templates. The Project Proponent Agreement, published in full.
Versioning and the Archive
Versioning and the Archive
Documents carry version numbers, statuses and effective dates. Superseded versions remain accessible, because a project validated under version 1.0 of a methodology must be able to point to that exact document years later.
No Walls
No Walls
No registration, no request forms, no NDA. Download and scrutinise.
VALIDATION & VERIFICATION
VALIDATION & VERIFICATION
Independent by Construction
Independent by Construction
Validation and verification are performed by independent accredited bodies, never by RenewCred.
Assignment runs through a blind pool, so neither the developer nor RenewCred chooses the checker. Independence is not a promise here. It is the mechanism.
The Blind Pool
The Blind Pool
Accredited bodies are assigned to projects at arm's length from everyone with a stake in the outcome, under a documented oversight framework.
What They Check
What They Check
Projects are validated against the Standard before crediting begins, and verified against the evidence checklist and the live monitoring record, with at least one verification a year. No credit is issued under a qualified opinion.
Better Evidence, Stronger Verification
Better Evidence, Stronger Verification
Continuous data does not replace the verifier. It arms them: richer datasets, earlier anomaly detection, and conclusions drawn from the record rather than the visit.
Become an Accredited VVB
Become an Accredited VVB
RenewCred accredits external validation and verification bodies under a published framework. If your organisation holds relevant accreditation and wants to work under the Standard, the route to apply starts here.
Apply for VVB Accreditation
Apply for VVB Accreditation
GOVERNANCE
GOVERNANCE
Who Guards the Standard?
Who Guards the Standard?
A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.
A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.
01
01
The Science Governing Council
The Science Governing Council
The Council approves methodologies, ratifies the scientific parameters that drive credit quantities, and controls changes to both. Its decisions are recorded, and the values it ratifies are published in the Ratified Parameter Register with change control that sits with the Council alone.
02
02
The Independence
Lock
The Independence
Lock
The independent majority is structural: commercial interest cannot outvote it, and conflicts are recorded in a published conflicts register. The rulebook cannot be captured by the people it regulates, including us.
03
03
Grievances, Complaints and Appeals
Grievances, Complaints and Appeals
Any stakeholder may raise a grievance, complaint or appeal, against a decision, a project or the programme itself. Each is acknowledged, handled under the published procedure and answered formally. The channel is on this page and in the footer of every page.
04
04
The
Documents
The
Documents
The Governance Charter, the conflicts register and the grievance procedure are in the Document Library, in full.
SCIENCE
SCIENCE
Where the Science Lives
Where the Science Lives
RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.
RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.
The Approach
The Approach
Measurement over estimation, wherever measurement exists. Methodologies are drafted by working scientists, reviewed by an independent community of over 100 climate scientists, and ratified by the Science Governing Council before anything is credited under them.
Settled Positions
Settled Positions
IPCC AR6 values on a 100 year horizon. Strict cumulative additionality. Conservative baselines. Per activity buffers for removals. Every quantitative value that drives a credit is fixed in the Ratified Parameter Register, with its source and status stated, so nothing numerical hides inside prose.
White Papers and Research
White Papers and Research
Research and white papers from the team and the community are published here as they are released, free to read and cite.
Work with Us
Work with Us
The RenewCred Science Community reviews methodologies, challenges assumptions and shapes the Standard. If that is your kind of work, join it.
Join the Science Community
Join the Science Community
Subscribe to Our Newsletter
No spam. Just pure climate intelligence.
Join Our WhatsApp Community
Connect with fellow climate optimists.
Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.
|
CIN No.: U74909KA2024PTC188240
Subscribe to Our Newsletter
No spam. Just pure climate intelligence.
Join Our WhatsApp Community
Connect with fellow climate optimists.
Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.
|
CIN No.: U74909KA2024PTC188240
The Rulebook, in the Open
The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.
What the Standard Requires
Every credit must be real, additional, permanent, independently verified and unique. Additionality is tested strictly and cumulatively, baselines are conservative, quantification follows IPCC AR6 values, and removal projects hold a 5% buffer against reversal.
Where the Documents Live
The Standard and the methodologies sit on standards.renewcred.com, with version history and no registration walls.
Who Governs It
Rulemaking sits with the Science Governing Council, a seven member body with an independent majority. The Governance Document explains how the lock works.
Have Your Say
Every instrument passes through public consultation before it takes effect. Every comment receives a response.
Read the Standard
Read the Standard
The Standard
The RenewCred Standard
The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.
Scope and Structure
The Standard is supported by a modular framework and annexes covering the conflicts register, the evidence checklist, registry procedures and the validation and verification framework, together with the Ratified Parameter Register: the single controlled list of scientific values that drive credit quantities.
Core Requirements
Real, additional, permanent, independently verified and unique, applied as strict requirements. Quantification is typed by pathway: reduction, avoidance, removal, or hybrid, where a hybrid project issues one credit carrying immutable avoidance and reduction components. Monitoring is annual with at least one verification a year by default, and no credit is issued under a qualified verification opinion.
Versioning
Versions are dated and permanent. A project validated under a given version can point to that exact document years later, because superseded versions remain accessible in the archive.
Status
Version 1.0 is active. The consultation bundle, including the Register and the Code as Source package, is downloadable from this site.
Read Full Standard
Methodologies
Methodologies
A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.
How to Read a Methodology Page
RC-BIO-ART
Version 1.0
Active
Each page states the code, the version, the status, what the methodology covers, how it quantifies outcomes and which parameters it draws from the Ratified Parameter Register, with the full document attached.
Status Labels
Active
Active means credits can be issued under it today.
Inactive
Inactive means no new credits can be issued under it. Credits already issued stay valid.
In Public Consultation
In consultation means the draft is open for public comment.
Public Consultation Closed
Public Consultation Closed means the comment period has ended and feedback is being reviewed.
Propose a Methodology
If your project type is measurable but not yet covered, the methodology development route develops a new methodology with our science community and takes it through public consultation before approval.
Open Methodologies
Open Methodologies
PUBLIC CONSULTATIONS
Public Consultations
Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.
Open Now
The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.
Read the Open Drafts
How It Works
Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.
Last Closed Consultation
Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.
Document library
Document Library
Every public RenewCred instrument, versioned, dated and free to download. If it governs a credit, it is here.
What You Will Find
The Standard and its modular framework. The annexes, including the conflicts register, the evidence checklist, registry procedures and the validation and verification framework. The Ratified Parameter Register. All methodologies. The project design and monitoring templates. The Project Proponent Agreement, published in full.
Versioning and the Archive
Documents carry version numbers, statuses and effective dates. Superseded versions remain accessible, because a project validated under version 1.0 of a methodology must be able to point to that exact document years later.
No Walls
No registration, no request forms, no NDA. Download and scrutinise.
Validation & verification
Independent by Construction
Validation and verification are performed by independent accredited bodies, never by RenewCred. Assignment runs through a blind pool, so neither the developer nor RenewCred chooses the checker. Independence is not a promise here. It is the mechanism.
The Blind Pool
Accredited bodies are assigned to projects at arm's length from everyone with a stake in the outcome, under a documented oversight framework.
What They Check
Projects are validated against the Standard before crediting begins, and verified against the evidence checklist and the live monitoring record, with at least one verification a year. No credit is issued under a qualified opinion.
Better Evidence, Stronger Verification
Continuous data does not replace the verifier. It arms them: richer datasets, earlier anomaly detection, and conclusions drawn from the record rather than the visit.
Become an Accredited VVB
RenewCred accredits external validation and verification bodies under a published framework. If your organisation holds relevant accreditation and wants to work under the Standard, the route to apply starts here.
Apply for VVB Accreditation
Apply for VVB Accreditation
Governance
Who Guards the Standard?
A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.
01
The Science Governing Council
The Council approves methodologies, ratifies the scientific parameters that drive credit quantities, and controls changes to both. Its decisions are recorded, and the values it ratifies are published in the Ratified Parameter Register with change control that sits with the Council alone.
02
The Independence Lock
The independent majority is structural: commercial interest cannot outvote it, and conflicts are recorded in a published conflicts register. The rulebook cannot be captured by the people it regulates, including us.
03
Grievances, Complaints and Appeals
Any stakeholder may raise a grievance, complaint or appeal, against a decision, a project or the programme itself. Each is acknowledged, handled under the published procedure and answered formally. The channel is on this page and in the footer of every page.
04
The
Documents
The Governance Charter, the conflicts register and the grievance procedure are in the Document Library, in full.
Science
Where the Science Lives
RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.
The Approach
Measurement over estimation, wherever measurement exists. Methodologies are drafted by working scientists, reviewed by an independent community of over 100 climate scientists, and ratified by the Science Governing Council before anything is credited under them.
Settled Positions
IPCC AR6 values on a 100 year horizon. Strict cumulative additionality. Conservative baselines. Per activity buffers for removals. Every quantitative value that drives a credit is fixed in the Ratified Parameter Register, with its source and status stated, so nothing numerical hides inside prose.
White Papers and Research
Research and white papers from the team and the community are published here as they are released, free to read and cite.
Work with Us
The RenewCred Science Community reviews methodologies, challenges assumptions and shapes the Standard. If that is your kind of work, join it.
Join the Science Community
Join the Science Community
Subscribe to our newsletter
No spam. Just pure climate intelligence.
Join Our WhatsApp Community
Connect with fellow climate optimists.
Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.
|
CIN No.: U74909KA2024PTC188240
Subscribe to our newsletter
No spam. Just pure climate intelligence.
Join Our WhatsApp Community
Connect with fellow climate optimists.
Copyright © 2026 Net Zero Initiative Pvt Ltd. All rights reserved.
|
CIN No.: U74909KA2024PTC188240
The Rulebook, in the Open
The RenewCred Standard defines what a credit must prove before it exists. This page is the map. The instruments themselves, every document, every version, live on our standards site, published in full.
What the Standard Requires
Every credit must be real, additional, permanent, independently verified and unique. Additionality is tested strictly and cumulatively, baselines are conservative, quantification follows IPCC AR6 values, and removal projects hold a 5% buffer against reversal.
Where the Documents Live
The Standard and the methodologies sit on standards.renewcred.com, with version history and no registration walls.
Who Governs It
Rulemaking sits with the Science Governing Council, a seven member body with an independent majority. The Governance Document explains how the lock works.
Have Your Say
Every instrument passes through public consultation before it takes effect. Every comment receives a response.
Read the Standard
THE STANDARD
The RenewCred Standard
The RenewCred Standard v1.0 sets the requirements under which carbon credits are validated, verified, issued and retired. It is published here in full, with every annex and its version history. Nothing that governs a credit is private.
Scope and Structure
The Standard is supported by a modular framework and annexes covering the conflicts register, the evidence checklist, registry procedures and the validation and verification framework, together with the Ratified Parameter Register: the single controlled list of scientific values that drive credit quantities.
Core Requirements
Real, additional, permanent, independently verified and unique, applied as strict requirements. Quantification is typed by pathway: reduction, avoidance, removal, or hybrid, where a hybrid project issues one credit carrying immutable avoidance and reduction components. Monitoring is annual with at least one verification a year by default, and no credit is issued under a qualified verification opinion.
Versioning
Versions are dated and permanent. A project validated under a given version can point to that exact document years later, because superseded versions remain accessible in the archive.
Status
Version 1.0 is active. The consultation bundle, including the Register and the Code as Source package, is downloadable from this site.
Read Full Standard
METHODOLOGIES
Methodologies
A methodology defines the baseline, boundary, evidence and quantification for one project type. This directory lists every methodology RenewCred operates: current versions, drafts in consultation and the archive.
How to Read a Methodology Page
RC-BIO-ART
Version 1.0
Active
Each page states the code, the version, the status, what the methodology covers, how it quantifies outcomes and which parameters it draws from the Ratified Parameter Register, with the full document attached.
Status Labels
Active
Active means credits can be issued under it today.
Inactive
Inactive means no new credits can be issued under it. Credits already issued stay valid.
In consultation means the draft is open for public comment.
In Public Consultation
Public Consultation Closed
Public Consultation Closed means the comment period has ended and feedback is being reviewed.
Propose a Methodology
If your project type is measurable but not yet covered, the methodology development route develops a new methodology with our science community and takes it through public consultation before approval.
Open Methodologies
PUBLIC CONSULTATIONS
Public Consultations
Every RenewCred instrument passes through public consultation before it takes effect, and the record stays here permanently: the draft, the comments and our responses. Consultation is not a formality. It is how the Standard earns the right to bind.
Open Now
The RenewCred Standard v1.0 and the seven launch methodologies have now completed the public consultation, but you can still provide your comments. The full bundle of consultation documents is downloadable below, and comments are submitted through this page.
Read the Open Drafts
How It Works
Windows run at least 30 days. Every comment receives a written response, and the complete record, comments and responses together, is published when the window closes. Substantive changes arising from consultation are made before promulgation, not after.
Last Closed Consultation
Closed consultations remain here in full, so anyone can trace how each instrument reached its current form.
Call for Consultation
View
Feedback Received
View
RenewCred’s Response
View
DOCUMENT LIBRARY
Document Library
Every public RenewCred instrument, versioned, dated and free to download. If it governs a credit, it is here.
What You Will Find
The Standard and its modular framework. The annexes, including the conflicts register, the evidence checklist, registry procedures and the validation and verification framework. The Ratified Parameter Register. All methodologies. The project design and monitoring templates. The Project Proponent Agreement, published in full.
Versioning and the Archive
Documents carry version numbers, statuses and effective dates. Superseded versions remain accessible, because a project validated under version 1.0 of a methodology must be able to point to that exact document years later.
No Walls
No registration, no request forms, no NDA. Download and scrutinise.
VALIDATION & VERIFICATION
Independent by Construction
Validation and verification are performed by independent accredited bodies, never by RenewCred.
Assignment runs through a blind pool, so neither the developer nor RenewCred chooses the checker. Independence is not a promise here. It is the mechanism.
The Blind Pool
Accredited bodies are assigned to projects at arm's length from everyone with a stake in the outcome, under a documented oversight framework.
What They Check
Projects are validated against the Standard before crediting begins, and verified against the evidence checklist and the live monitoring record, with at least one verification a year. No credit is issued under a qualified opinion.
Better Evidence, Stronger Verification
Continuous data does not replace the verifier. It arms them: richer datasets, earlier anomaly detection, and conclusions drawn from the record rather than the visit.
Become an Accredited VVB
RenewCred accredits external validation and verification bodies under a published framework. If your organisation holds relevant accreditation and wants to work under the Standard, the route to apply starts here.
Apply for VVB Accreditation
Apply for VVB Accreditation
GOVERNANCE
Who Guards the Standard?
A standard is only as strong as the people empowered to say no. RenewCred's rulemaking sits with the Science Governing Council, a seven member body with an independent majority, and an independence lock written into our charter.
01
The Science Governing Council
The Council approves methodologies, ratifies the scientific parameters that drive credit quantities, and controls changes to both. Its decisions are recorded, and the values it ratifies are published in the Ratified Parameter Register with change control that sits with the Council alone.
02
The Independence Lock
The independent majority is structural: commercial interest cannot outvote it, and conflicts are recorded in a published conflicts register. The rulebook cannot be captured by the people it regulates, including us.
03
Grievances, Complaints and Appeals
Any stakeholder may raise a grievance, complaint or appeal, against a decision, a project or the programme itself. Each is acknowledged, handled under the published procedure and answered formally. The channel is on this page and in the footer of every page.
04
The Documents
The Governance Charter, the conflicts register and the grievance procedure are in the Document Library, in full.
SCIENCE
Where the Science Lives
RenewCred is run by scientists and reviewed by more of them. This page collects the scientific backbone: our approach, the settled positions and the research we publish.
The Approach
Measurement over estimation, wherever measurement exists. Methodologies are drafted by working scientists, reviewed by an independent community of over 100 climate scientists, and ratified by the Science Governing Council before anything is credited under them.
Settled Positions
IPCC AR6 values on a 100 year horizon. Strict cumulative additionality. Conservative baselines. Per activity buffers for removals. Every quantitative value that drives a credit is fixed in the Ratified Parameter Register, with its source and status stated, so nothing numerical hides inside prose.
White Papers and Research
Research and white papers from the team and the community are published here as they are released, free to read and cite.
Work with Us
The RenewCred Science Community reviews methodologies, challenges assumptions and shapes the Standard. If that is your kind of work, join it.
Join the Science Community
Join the Science Community
Sign up for our newsletter
No spam. Just pure climate intelligence.
Copyright © 2026 Net Zero Initiative Pvt Ltd.
All rights reserved.
CIN No.: U74909KA2024PTC188240
Join Our WhatsApp Community
Connect with fellow climate optimists.
Sign up for our newsletter
No spam. Just pure climate intelligence.
Copyright © 2026 Net Zero Initiative Pvt Ltd.
All rights reserved.
CIN No.: U74909KA2024PTC188240
Join Our WhatsApp Community
Connect with fellow climate optimists.